Brüsel will delight fans of well-crafted comics. There’s everything in this book: top-quality graphics, attention to detail, an overflowing imagination on the part of the authors, a little humor and sensuality, a touch of cynicism.
We find ourselves with familiar themes, but developed backwards from common sense to pique the reader’s curiosity. Society will be saved by the advent of plastics, a veritable revolution. And we’ll finally be able to get rid of the plants we have to look after, which wither away and constantly need a little water.
The authors also take an original approach to the deterioration of hospital care. The script shows us a patient who is always promised incredible treatments by a doctor whose reputation is beyond reproach. However, no intelligent action is taken, and the patient gradually recovers from the lack of treatment.
The hero of the story and an employee he meets by chance form an unconventional duo and take us into the twists and turns of a city in the making that a megalomaniac is designing without consulting the citizens.
The few people appointed to obey the wishes of a single man walk around with scaled-down buildings under their arms and place here and there the skyscrapers of the future city. It’s all decided behind closed doors and in the interests of a few, as sometimes happens in city planning.
In short, if you’re looking for a story and graphics out of the ordinary to escape from déjà vu, this is the comic for you.
The graphic novel “Un tournage en enfer: au cœur d’Apocalypse Now” takes us right to the heart of the creation of Francis Ford Coppola‘s famous film, brought to the screen in 1979. As the director points out, [my translation] “[…] we were in the jungle. There were too many of us. We had access to too much money and too much material, and little by little, we all went crazy…”.
It didn’t start well. Right from the start, the director was unable to convince well-known actors to get involved in his film. In turn, actors such as Jack Nicholson, Al Pacino, Robert Redford and James Caan refused to join the adventure. Coppola continues his research and interviews.
As readers, we go behind the scenes of the production and hear from those close to the filmmaker. Filming begins in the jungle of the Philippines, even though Coppola has no idea on how the film will end. This would haunt him throughout the production, causing him sleepless nights when he was already quite exhausted.
Cost overruns followed, and the pressure on the director from financial backers increased. He was asked to complete his film as quickly as possible, which he proved unable to do. Coppola came to guarantee the required funds by pledging to pay off the debt himself if box-office receipts failed to reach $40 million.
In addition, it was taken for granted that the U.S. government would provide the helicopter gunships required for the film’s action. But in the aftermath of the Vietnam War, the interest of American politicians in such requests waned. The director had to turn to the then President of the Philippines, Ferdinand Marcos, to obtain helicopters and personnel, in return for certain fees and compensation. But these aircraft sometimes left the scene on Marcos’s orders to go hunting for the regime’s enemies. Coppola was falling behind again…
They thought that Harvey Keitel would be the ideal actor to play Robert Duvall. Many sequences later, the obvious becomes clear: the man just didn’t cut it for a number of reasons. On the verge of disaster, they urgently contacted Martin Sheen and beg him to replace Keitel. Multiple scenes had to be reshot with the new actor, and the delays and associated costs continued to mount.
All sorts of other pitfalls awaited the director and his crew throughout the shoot, including the language barrier with the Filipinos and a storm that destroyed the set. The widespread use of drugs and alcohol by staff and helicopter pilots didn’t help matters either.
The mosquitoes, the heat and Coppola’s constant demands took their toll on the actors. Martin Sheen fell seriously ill, and his brother had to be used for some of the secondary scenes. Rather than use only actors to simulate deaths, a staff member went to the morgue and returned with a corpse. This prompted the arrival of the police force, and the problem was solved with generous sums of money.
There were many other factors that delayed the end of the shoot and increased costs. Marlon Brando’s demands were a case in point. They managed to get him back on set for an extra day, provided that he received $70,000 more than planned.
Shooting finally ended in 1977. The team chartered a private plane to fly 381 kilometers of original film to the United States. Editing the film proved to be an ordeal. There was too much material to analyze. In 2001, Coppola presented a modified version of his original 1979 production. In 2019, he finally delivered a final 182-minute version, Apocalype Now “Final cut” , more than forty years after the initial release.
Earnings met the director’s expectations, and he ultimately won his bet. In all, the film generated $140 million from a total budget of $30 million.
Comfortably seated on the new terrace of Quebec City’s Station de la Plage, I wrote this article sheltered from the elements.
Phase 3 of the Promenade Samuel-De Champlain in Quebec City will have cost around $190 million. A site foreman confides: “The most complex part of all this was complying with the actual government requirements. We had to do a lot of digging and install infrastructure to prevent wastewater from being discharged into the St. Lawrence River. We also had to deal with the sudden increase in inflation: to avoid a $50 million overrun, we had to shorten the width of the children’s romper and cut where it had to least impact “.
While out cycling, I took the opportunity to snap a few shots of the construction progress around what will develop into the “station de la Plage”.
The picture above shows the production of the reinforced concrete for the main staircase.
Below, the finished steps can be seen. What will become the swimming pool (on the left of the photo) receives its first coat of paint. A modification to the pool’s depth necessitated the installation of a fence.
It can disappear completely into the ground as soon as swimming is allowed. However, its operation is currently causing serious problems, as with all novelties. When the motor exerts too much force to raise a section of fence, it falls back down on its own. The presence of sand in the vicinity may have been ignored, or at least its effect underestimated, when the railing was designed. Sand is inserted into the gears with each day’s activity. And there’s no question of using grease to make it easier to raise and lower the panels: the sand would stick to the lubricant and further complicate operations. A technician has been working for weeks to rectify the situation.
The pool has now received a coat of blue paint. This creates a clear demarcation with the color of the river water, an effect that will also benefit photographers. Only a few preparations remain before the population can officially access the site. The Commission de la capitale nationale de Québecwants people to be able to bathe just in time for the Fête nationale des Québécois, on June 24.
From now on, the incredible popularity of the site with the public will have to be managed. Indeed, in their eagerness to access the beach, few individuals bother to read the current regulations. This task will fall to the security staff, who will have to utilize their teaching skills and diplomacy to get the message across.
We have arrived at the last article in the “ Building a patio ” series. The photo above shows the two-tiered flower box as well as the three-step staircase that has been completely redone. The last step must be cut at an angle to follow the pronounced drop in the ground at this point, under the patio.
A general view of the railing and of the black metal fence to the left of the photo which has been sawn and set back in cement.
Above is a view of the red cedar siding built under the patio. I kept an access to the hose and didn’t block out all of the light entering in the basement window. Another fixture has also been reactivated.
The photo above shows a close-up of the siding under the patio. We can see a metal pole near the watering can which seems to support the terrace: its practical function is null; it is only there for appearance (all the siding is firmly fixed from the top).
Overview of the terrace.
Another overview of the patio. This time, I took the picture in HDR, meaning five pictures were taken with a different aperture and compiled on a computer to achieve a result that fights the highlights in the background. When you shoot westward with the sun going down, that’s what it looks like: you have to correct the photo in order to see something. The terrain looks larger than it actually is: this is due to the effect of the wide-angle lens.
The last photo is of a squirrel and a blue jay who regularly invite each other for a peanut meal on the patio. If you want to see some close-up photos of these blue jays, click on these pages of my site: Blue Jay in Autumn and Blue Jay and Russian Mountain Ash.
I hope this series on renovation and on building a patio has been helpful to you.
Planning and execution errors forced me to redo some work, including a staircase and the base that will receive this staircase. Renovation is also about going back (but as little as possible!). The cost of additional materials is negligible, but it will take time. It is now necessary to build a staircasewith three steps sitting on a very solid base.
This time, I dig a foot deep, and add 0-3 / 4 rock and stone dust, followed by a few slabs that will receive the stair stringers.
Here is the final result. Nothing will move.
From 2X12 spruce boards, the four stringers are cut.
The four stringers rest securely on the slabs and are covered with a red Resisto waterproof membrane: this will prevent rot from settling on the stringers. An additional board is needed to accommodate the stringers and it should be placed under the contour beam.
The photo above shows the final result, just before the stain is applied.
Above is an overview of part of the new terrace, with the new three-step staircase. The grass in front of the steps is badly damaged, having suffered the effects of construction for an extended period. But next spring, everything will be back to normal.
This is the final look of the new staircase the following spring, after the wood stain has been applied and the fixtures have been reinstalled one by one around the patio. Fortunately, not all of the electrical wires were cut by the mechanical shovel, which made their reinstallation easier.
Continued in the next article: “Building a patio (7 of 7)”.
The third staircase and the ramp are under construction. The vertical posts and steps are made of spruce and the rest will be red cedar.
Construction of the railing has started. Initially, we thought of a metal railing with glass panels. We investigated the available models and it seemed to us that the appearance was a bit too modern for the age of the house. We thought that continuing with the same materials as the terrace would be a better idea. I drew up railing plans and had family members vote on which model to use.
One at a time, the horizontal bars of red cedar are installed between the vertical posts. Spirit level and measuring gallon ensure that the appearance will be as correct as possible. The flaws are easy to see when a railing of this length is built, with so many separate pieces inside.
This is the final effect, when the thirty-six pieces of wood have been cut and laid.
The black metal fence that stood right next to the patio was partially dismantled during the installation of the new French drain. The cement bases of the fence posts were damaged by machinery. It was now necessary to get this old cement out of the ground, regroove, cut off five centimeters from the fence, re-weld the parts of the fence together, recast cement and replant the metal posts.
I tried to have the work done by Clôture Provinciale, of St-Augustin, because the initial fence had been made by them, according to my drawing. After ten calls, months of waiting and no return calls, I tried to approach other companies to do the work. I was told I would have to wait until next year because all the companies had contracts for months to come. Finally, I found a company in Beauport that bid $ 2700.00 to do the work. But it was a bit expensive.
So I decided to do a lot of the work myself, but still called on Clôture Nordik to pull the old cement bases out of the ground and dig two new holes at least 5 feet deep. I sawed off the metal fence and had the sections welded together. I then poured 700 pounds of cement into the two holes, laid the metal posts and reinstalled the fence. I then applied a coat of black Tremclad paint. Total expenses: $ 700 instead of the $ 2700 proposed by the Beauport company.
Here is the final result for the fence.
Continued in the next article: “Building a patio (6 of 7)”.
I had counted on the presence of a carpenter to make the connection between the beamsunder the white shed and the new terrace. Connecting a 1954 construction with a new, differently designed patio is not that easy, especially for me. What was also not easy was to hire experienced staff to do this part of the job. After multiple calls left and right to find an employee, I resolved to take on the job alone. Everything went well, however, with savings as a bonus.
In the picture above, a red Resisto waterproof membrane is glued to each beam and joist to protect the wood from rot.
The opening into the terrace is still clearly visible. It was closed, after a change of plan. Two joists were added in the middle of the hole for added strength and a few boards were cut and rearranged to complete the floor and close the opening.
A red cedar table (the first table I ever built) was placed where the old opening in the terrace floor was.
During the project, I made the mistake of not supervising the work after hiring an electrician to lay the exterior wiring. The photo above is the very definition of a job poorly done (a better term would be a shitty job). The guy made multiple holes in the brick, not even aligned, and buttered the wall with silicone, after installing a lamp that hangs crooked. That’s why you have to do the work yourself, when possible. But with electricity, we are forced to deal with professionals. In short, the company had to redo the work.
The flooring is now completed on both levels, but I haven’t had time to stain it yet. It also lacks a railing on the second level, a third staircase at the end of the terrace, a ramp, and it is also necessary to resize and reinstall a metal fence that was taken out of the ground during the work of the new drain, in addition to reconnect the wiring of the lampposts that was cut by the mechanical shovel. But the renovations are moving forward …
Continued in the next article: “Building a patio (5 of 7)”.
To screw the 2X6 boards I use the CAMO system with screws that do not show, being screwed obliquely to the side of the boards: this improves the overall appearance without compromising on strength. When it comes to tools, I belong to the dinosaurs: only wire equipment, nothing with a battery.
The original plans called for an opening in the patio floor on the first level to allow light to pass through to a basement window. It is also in this opening that I work in the photo above. The plan messed up, with the final aesthetic and positive family comments missing. Project management also involves unforeseen events… I had to apply plan B, that is to say improvise.
The red cedar planks are used in the construction of the railing, the flower box, the handrail and the siding under the terrace. Some are knotless, for the more visible places, and others are with knots. There is naturally a good price difference between the two categories.
Each red cedar plank has a very pale beige color. To give it a darker tone, it must be sanded and stained with two coats of a special oil. It is important to wait a day between layers. In the photo above, six boards that have received the proper treatment are quietly drying outside. This is a process that requires time and proper weather if you don’t have a garage to let it dry out.
Above, the second staircase has just been completed. It has only two steps, because I wanted to rise the terrain a bit and I thought it would eventually reach the threshold of the stairs. Unfortunately, it was a step in the planning that was reviewed the following summer and this two-step staircase was eventually destroyed and redone to contain three steps. I miscalculated the optimal ground elevation and the wrong estimates have consequences. To add to the problem, the winter frost that followed the 2019 construction proved to me that the base of the stairs needed to be redesigned. I should have made a deeper hole in the ground to build a more stable base for the steps. Renovation also means learning and having to correct mistakes …
Above is the two-tiered flower box, made of knotless red cedar. You can see that the patio floor is not stained yet. Once dyed, it will never look exactly the same color as the flower box, as the floor is made of spruce (the good old regular 2X6) while the rest of the construction is usually red cedar. But the colors will be sufficiently alike.
Above, a general view of the work in progress. Everything is still far from over.
Another general view of the first part of the terrace. The floor looks darker than in the previous photo, but this is only due to the effect of the rain.
Continued in the next article: “Building a patio (4 of 7)”.
If you can (you have the vehicle and the time), go get your wood yourself and select it piece by piece. Take as many trips as you need, because the effort is worth it. Often, if you order, you end up with certainly a 10-15% of pieces of wood that are crooked, twisted, cracked or with significant knots: the general appearance suffers, in addition to the losses with which you will have to contend and the increased difficulty level to adjust all those pieces together. Building a patio is made easier with quality products.
The first 6 x 6 posts are placed on five adjustable piles, to support the large contour beam that will run along the house. The contour beam is made of pieces of wood 2 X 12 that are doubled, glued and screwed.
In the picture above, the contour beam is under construction. In the background, a few joists are already anchored to the building. The family wants to get out through the patio door as soon as possible and I must therefore lay a first section of flooring as soon as possible.
The spirit level on the beam makes it possible to verify that the height of the first floor of the patio will be the same over the entire length of the house. It is easier to work with a long spirit level because it is less forgiving of mistakes.
The beams are now placed on the eleven adjustable piles. At this point, I tell myself that it is too late to go back … Some of the piles having been slightly repositioned because of the rocks, so I have to accept some compromises in order to be able to screw the underside of the beams to the piles. But it ends up working …
The joists are now attached to the beams with joist hangers. Then begins the delicate task (at least for me) of fixing the long wooden posts vertically to the patio. When a post is slightly crooked, it must be repositioned immediately before the construction adhesive solidifies. Here, the spirit level and the neighbors’ comments are useful. Subsequently, the screws make it possible to solidify the construction definitively.
View of the patio from another angle. The first chair is already out on a temporary installation on the second floor of deck! The black waterproof membrane shown in the picture above was not good enough : it wrinkled and did not stick enough. I changed it to a red Resisto membrane.
It’s starting to look like a patio. I completed my first stairs. There are some minor renovation errors on my part, but I’m very happy overall. No one fell yet, and the patio doesn’t make any weird sounds. Two chairs are out and there is finally a semblance of normalcy, while the project progresses further. It will be necessary to stain all this, but there is no hurry.
Continued in the next article: “Building a patio (3 of 7)”.
The following series of seven articles discuss patio building. This new patio was necessary because the old one was over thirty years old and showing obvious signs of fatigue, in addition to greatly hampering the digging work along the foundation to change the French drain and insulate the foundation.
Above, the old wooden patio is demolished with a mechanical shovel. Where the machine cannot go, I finish the demolition by hand. Subsequently, digging begins to reach the foundation.
Once the trench has been dug, the employees of the Garco company install the French drain and prepare the concrete surface that will receive the new insulation (blown urethane).
When the drain is complete and the urethane has been blown out, an employee reseals the hole, adding soil, rock and sand, the latter only required for less stable terrain.
Now we have to think about rebuilding a patio. The savings are significant when you do the work yourself. It has been reported to me that generally the cost of labor is 2.7 times the cost of materials. In the case of a large patio made up mainly of cedar planks, each plank of which will be sanded and stained by hand, the savings amount to several tens of thousands of dollars.
At 62, I unfortunately have no experience in the field. Risk management (especially financial) is necessary and, since the work will be carried out without assistance, I prefer to work from plans designed by a company. A specialist in the construction industry offered me his advice before the project started, because there was no question of starting the patio again.
On the proposed plan, there must be eleven adjustable metal piles anchored in the ground to receive the patio. We must therefore measure where the eleven metal poles from Techno-Pieux will go, because they are not responsible for doing the calculations for me.
I am using a laser pointer for the first time. It is not easy to work with this device outdoors, the red dot of the laser being difficult to see in bright light (the base model I got myself certainly did not make the job easy). Eventually, I got through it. Luckily, I wasn’t doing the job for a client.
The Techno-Pieux technician gets to work. He relies on the wooden posts to drive his stakes and then checks with his laser (much better) if his posts are perfectly aligned. The problem that sometimes occurs is that he meets a rock and has to start over and reposition his stakes slightly off the ideal line. A slight slope is also necessary to facilitate the flow of water onto the patio. The piles therefore must not be perfectly level from the house to the end of the patio.
A rented hammer drill is sufficient to make the holes in the concrete that will be used to fix the first piece of wood in the foundation of the house. The screws are laid alternately to avoid creating weaknesses in the wood. It is on this piece of wood that a small part of the patio will rest. Special waterproof insulating tape is applied to the wood to protect it from rotting that could occur after several years when water gets under the patio boards.
Continued in the next article: “Building a patio (2 of 7)”.